DLA McNamara Headquarters Complex HVAC Renovations

Project Detail

LOCATION
Fort Belvoir, VA
CLIENT
U.S. Army Corps of Engineers Baltimore District
SIZE
1,120,000 SF
PROJECT TYPE
Renovation
Occupied Renovation

As a follow-on design to an HVAC and energy study of the McNamara Headquarters Complex, Summer Consultants designed upgrades to the HVAC systems serving the 1.12 million SF office building.

Three 500-ton chillers were replaced with 700-ton chillers and and existing 300-ton chiller was modified to improve performance. New variable frequency drives were installed on all air handling units. The existing primary/secondary plant configuration was modified to a variable primary configuration, reducing pump energy usage. All existing pneumatic controls were replaced with direct digital controls and integrated with the existing control system.

The improvements were one of several  energy conservation measures recommended to achieve the goal of a 30% reduction in energy consumption.

Join Our Team
Join Our Team
Recent Projects
Recent Projects